Logistic Curation
Tuesday, 26 February 2013
Equipment
Installation Equipment:
- Dell Touch Screen Monitor/Desktop
- 2x CPUs
- 2x Keyboards & Mouses
- 2.1 Speakers
- Modem Fiber Cable (5m)
- x2 Plug Extensions
- Stool
- Semi-Shaped Pyramid Cupboard
- Locker
- Disco Ball Light
Video Shooting Equipment:
- 2x Canon EOS 650D (Camera)
- 2x Camera Tripod
- CCD Camera
- CCD Tripod
- Shotgun Mic
- 2x Reflective Fluorescent Light Stands
- 2x Spot Light Stands
Tuesday, 22 January 2013
Preferred Location
The upper-left side of that corner, that's the preferred location for our final (maybe test phase) setup. That location may yet to be approved, though.
Wednesday, 16 January 2013
Curation Notes
Today's Discussion
- Location is yet to be decided as hardware, video shooting progress and software are still in concern.
- Student's Lounge (outside of library) is preferred. All phases of testing are to be done in IIS (workshop).
- 'Light Box' and/or 'Projection' layout are preferred but, keyboard and/or mouse (PC input hardware) will be included as backup or 'Plan B'.
- Software will be the last concern of the plan.
- It's / If possible; will have more than one setup in a single layout or location as designated.
Early Planned Layouts
Layout 1
Layout 2
Layout 3
Layout 4
Subscribe to:
Posts (Atom)